19. Remove flue gas analyser and seal test point; also remove manometer and re-
tighten test nipple and test for soundness.
20. Simulate a lock out condition by turning off gas cock, the boiler will attempt to fire
4 times, on the 5
th
attempt the boiler will lock out on flashing 0@, see Table 18 ;
lock out codes. Re-set the boiler using the reset key.
21. Re-fit boiler front panel and close grey panel
22. Allow boiler to run up to its set flow temperature, see Par. 6.5.1 and shut off
23. When pumps have stopped, check water pressure is correct
24. The boiler is now ready for use
25. Check system controls
26. Set system controls to required values
Complete commissioning sheet, recording boiler serial No and site details and return
copy to Broag for record purposes
NOTE: The Remeha Quinta 85 is supplied with a number of factory default settings
which should be correct for most installations. If other setting values are required refer
to Par. 6.5 and 6.6.
9.1 Shut-down
9.1.1 Temporary shut-down with frost protection
- Do not isolate the electric power supply.
- Do not close the gas cock.
- Use the switch function, see Par. 6.1.3.
9.1.2 Permanent shut-down without frost protection
- Set system controls to off.
- Isolate the electric power supply.
- Close the gas cock.