15. Re-establish power supply to boiler and isolate controls.
16. Use manual override to start the boiler (press and hold for 5 seconds[-]-key (green
LED should appear in h-symbol)
17. The boiler should start with the run sequence (3) indicated in the ‘code’-display,
see Par. 6.3.
18. Check the boiler for correct gas/air setup in full load by measuring the O
2
levels in
the flue gas (direct measurement of CO
2
can lead to inaccuracies due to varying
levels of CO
2
in the natural gas). Proceed as follows:
Correct gas/air setup:
18 a. Force the boiler into high fire by pressing ‘m and [+] -keys simultaneously. The
code box will show and H in the display
18 b. When full load speed is reached check values against Table 16 (setting data) and
adjust if necessary using the screw on the venturi, turning screw anti clockwise
will increase CO
2
, turning screw clockwise will decrease CO
2
, (see Fig. 20)
18 c. Check flame via inspection window, the flame should be stable, mainly blue with
burner surface covered with orange dots.
18 d. Force the boiler into low fire by pressing the m and [-] -keys simultaneously.
The code box will show an L in the display; please see Par. 6.1.3.
When part load speed is reached, check values against Table 16 and adjust if
necessary using the screw on gas combi block,(adjustment screw is protected by
a cover - both cover and adjustment screw are torx star type keys) turning screw
clockwise will increase CO
2
, turning screw anti clockwise will decrease CO
2
, (see
Fig. 20) Check flame via inspection window, the flame should be stable, with a
regular blue flame distribution and orange burner surface
Fig. 20 Setting screws
00.W4H.79.00005
ß full-load setting screw
Þ part-load setting screw