REMEHA Quinta 85 Technical Information Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
Remeha Quinta 85
4
8.3 External connections 43
8.4 Boiler control 44
8.4.1 Modulating (two wire control) 44
8.4.2 Analog control (0 -10 Volt dc) 46
8.4.3 On / off control (1 x no volt switched pair) 47
8.4.4 High / low control (2 x no volt switched pairs) 48
8.5 DHW control (Broag priority) 48
8.5.1 Temperature control 48
8.5.2 Primary flow control 48
8.6 System pump 48
8.7 Frost protection 48
8.8 Remote alarm and boiler run indication 48
8.9 Safety interlock 49
9 Commissioning 50
9.1 Shut-down 53
9.1.1 Temporary shut-down with frost protection 53
9.1.2 Permanent shut-down without frost protection 53
10 Fault-finding 54
10.1 General (all installations) 54
10.2 Fault codes 55
11 Inspaction and servicing instructions 59
11.1 General 59
11.2 Annual Inspection 59
11.3 Maintenance 60
11.4 Cleaning the fan 61
11.5 Cleaning the venturi 61
11.6 Cleaning the heat exchanger 61
11.7 Cleaning the burner assembly 61
11.8 Cleaning the siphon 61
11.9 Cleaning/replacing the ignition/ionisation electrode 62
11.10 Cleaning to inspection glass 62
11.11 Part list Quinta 85 boiler 63
Page view 3
1 2 3 4 5 6 7 8 9 ... 67 68

Comments to this Manuals

No comments